Quotes typically within 24 hours
    SOUTH AUSTRALIA

    Bolting for Cooper Basin & Moomba.

    The Moomba gas plant processes Cooper Basin gas and liquids, which are piped to Port Bonython near Whyalla for fractionation and export.

    Supplying Cooper Basin & Moomba

    Quotes
    Returned within 24 hours, with lead time confirmed on every quotation.
    Delivery
    Direct to site, yard or your forwarder — terms quoted on every order.
    Emergencies
    RapidBolt answers urgent breakdown requests 24/7 on +61 (0)7 4055 6928.
    Certification
    EN 10204 3.1 with every lot; 3.2, PMI, Charpy and NACE on request.

    Industry in the area

    • Gas plant

      Santos · Moomba gas processing plant, Moomba — processing hub for Cooper Basin gas and the Moomba CCS project

    • Terminal

      Santos · Port Bonython fractionation & export, Whyalla — liquids fractionation and shipping

    What plants in Cooper Basin & Moomba order

    Gas processing plants

    Flange, valve and exchanger bolting for treating, compression and dehydration — B7 with 2H nuts, B7M and 2HM where sour service to NACE MR0175 / ISO 15156 is specified.

    Terminals, ports & pipelines

    Tank, jetty, loading-arm and pipeline flange bolting — B7/2H with coatings for coastal exposure, and stainless or duplex near the waterline.

    Typical grades only — final material selection follows your specification and engineering requirements.

    Questions

    Related pages

    Request a quote for Cooper Basin & Moomba

    INDUSTRIAL PROJECT ENQUIRY

    Request a Quote

    PDF, XLSX, CSV, CAD or images · up to 10 files, 25 MB each

    Quotes typically within 24 hours. Specialised industrial supply, buy-to-order with quoted lead time.

    Other service areas

    All service areas